½Ã½ºÅÛÀÎÁõ Á¦Ç°ÀÎÁõ ±â¼ú¸¶Å© ±â¾÷Çõ½Å Áöµµºñ¿ë ÀÎÁõ/ÁöµµÀýÂ÷ °í°´¼¾ÅÍ È¸»ç¼Ò°³
 
 
 
   
 
 
 
³¯Â¥

2003³â02¿ù04ÀÏ (È­¿äÀÏ) 12:59:06

Á¶È¸ 5600
Á¦¸ñ

ISO 9001 : 2000 (Annex)


¢Ã ISO 9001 - Annex A


(informative)

Correspondence between ISO 9001:2000 and ISO 14001:1996

Table A.1 Correspondence between ISO 9001:2000 and ISO 14001:1996

ISO 9001:2000

ISO 14001:1996

Introduction

-

Introduction

General

0.1

Process approach

0.2

Relationship with ISO 9004

0.3

Compatibility with other management systems

0.4

Scope

1

1

Scope

General

1.1

Application

1.2

-

-

Nonnative reference

2

2

Normative references

Terms and definitions

3

3

Definitions

Quality management system

4

4

Environmental management system requirements

General requirements

4.1

4.1

General requirements

Documentation requirements

4.2

General

4.2.1

4.4.4

Environmental management system documentation

Quality manual

4.2.2

4.4.4

Environmental management system documentation

Control of documents

4.2.3

4.4.5

Document control

Control of quality records

4.2.4

4.5.3

Records

Management responsibility

5

4.4.1

Structure and responsibility

Management commitment

5.1

4.2

Environmental policy

Customer focus

5.2

4.3.1

Environmental aspects

4.3.2

Legal and other requirements

Quality policy

5.3

4.2

Environmental policy

Planning

5.4

4.3

Planning

Quality objectives

5.4.1

4.3.3

Objectives and targets

Quality management system planning

5.4.2

4.3.4

Environmental management programme(s)

Responsibility, authority and communication

5.5

4.1

General requirements

Responsibility and authority

5.5.1

4.4.1

Structure and responsibility

Management representative

5.5.2

Internal communication

5.5.3

4.4.3

Communication

Management review

5.6

4.6

Management review

General

5.6.1

Review input

5.6.2

Review output

5.6.3

Resource management

6

4.4.1

Structure and responsibility

Provision of resources

6.1

Human resources

6.2

General

6.2.1

Competence, awareness and training

6.2.2

4.4.2

Training, awareness and competence

Infrastructure

6.3

4.4.1

Structure and responsibility

Work environment

6.4

Product realization

7

4.4

Implementation and operation

4.4.6

Operational control

Planning of product realization

7.1

4.4.6

Operational control

Customer-related processes

7.2

Determination of requirements related to the

7.2.1

4.3.1

Environmental aspects

product

4.3.2

Legal and other requirements

4.4.6

Operational control

Review of requirements related to the product

7.2.2

4.4.6

Operational control

4.3.1

Environmental aspects

Customer communication

7.2.3

4.4.3

Communications

Design and development

7.3

Design and development planning

7.3.1

4.4.6

Operational control

Design and development inputs

7.3.2

Design and development outputs

7.3.3

Design and development review

7.3.4

Design and development verification

7.3.5

Design and development validation

7.3.6

Control of design and development changes

7.3.7

Purchasing

7.4

4.4.6

Operational control

Purchasing process

7.4.1

Purchasing information

7.4.2

Verification of purchased product

7.4.3

Production and service provision

7.5

4.4.6

Operational control

Control of production and service provision

7.5.1

Validation of processes for production and

7.5.2

'

service provision

Identification and traceability

7.5.3

Customer property

7.5.4

Preservation of product

7.5.5

Control of monitoring and measuring devices

7.6

4.5.1

Monitoring and measurement

Measurement, analysis and improvement

8

4.5

Checking and corrective action

General

8.1

4.5.1

Monitoring and measurement

Monitoring and measurement

8.2

Customer satisfaction

8.2.1

Internal audit

8.2.2

4.5.4

Environmental management system audit

Monitoring and measurement of processes

8.2.3

4.5.1

Monitoring and measurement

Monitoring and measurement of product

8.2.4

Control of nonconforming product

8.3

4.5.2

Nonconformance and corrective and preventive action

4.4.7

Emergency preparedness and response

Analysis of data

8.4

4.5.1

Monitoring and measurement

Improvement

8.5

4.2

Environmental policy

Continual improvement

8.5.1

4.3.4

Environmental management programme(s)

Corrective action

8.5.2

4.52

Nonconformance and corrective and preventive action

Preventive action

8.5.3





Table A.2 Correspondence between ISO 14001:1996 and ISO 9001:2000

ISO 14001:1996

ISO 9001:2000

Introduction

-

0

Introduction

0.1

General

0.2

Process approach

0.3

Relationship with ISO 9004

0.4

Compatibility with other management systems

Scope

1

1

Scope

1.1

General

1.2

Application

Normative references

2

2

Nonnative reference

Definitions

3

3

Terns and definitions

Environmental management system

4

4

Quality management system

requirements

General requirements

4.1

4.1

General requirements

5.5

Responsibility, authority and communication

5.5.1

Responsibility and authority

Environmental policy

4.2

5.1

Management commitment

5.3

Quality policy

8.5

Improvement

Planning

4.3

5.4

Planning

Environmental aspects

4.3.1

5.2

Customer focus

7.2.1

Determination of requirements related to the produc

7.2.2

Review of requirements related to the product

Legal and other requirements

4.3.2

5.2

Customer focus

7.2.1

Determination of requirements related to the product

Objectives and targets

4.3.3

5.4.1

Quality objectives

Environmental management programme(s)

4.3.4

5.4.2

Quality management system planning

8.5.1

Continual improvement

Implementation and operation

4.4

7

Product realization

7.1

Planning of product realization

Structure and responsibility

4.4.1

5

Management responsibility

5.1

Management commitment

5.5.1

Responsibility and authority

5.5.2

Management representative

6

Resource management

6.1

Provision of resources

6.2

Human resources

6.2.1

General

6.3

Infrastructure

6.4

Work environment

Training, awareness and competence

4.4.2

6.2.2

Competence, awareness and training

Communication

4.4.3

5.5.3

Internal communication

7.2.3

Customer communication

Environmental management system documentation

4.4.4

4.2

Documentation requirements

Document control

4.4.5

4.2.3

Control of documents

Operational control

4.4.6

7

Product realization

7.1

Planning of product realization

7.2

Customer-related processes

7.2.1

Determination of requirements related to the product

7.2.2

Review of requirements related to the product

7.3

Design and development

7.3.1

Design and development planning

7.3.2

Design and development inputs

7.3.3

Design and development outputs

7.3.4

Design and development review

7.3.5

Design and development verification

7.3.6

Design and development validation

7.3.7

Control of design and development changes

7.4

Purchasing

7.4.1

Purchasing process

7.4.2

Purchasing information

7.4.3

Verification of purchased product

7.5

Production and service provision

7.5.1

Control of production and service provision

7.5.3

Identification and traceability .

7.5.4

Customer property

7.5.5

Preservation of product

7.5.2

Validation of processes for production and service

Provision

Emergency preparedness and response

4.4.7

8.3

Control of nonconforming product

Checking and corrective action

4.5

8

Measurement, analysis and improvement

Monitoring and measurement

4.5.1

7.6

Control of monitoring and measuring devices

8.1

General

8.2

Monitoring and measurement

8.2.1

Customer satisfaction

8.2.3

Monitoring and measurement of processes

8.2.4

Monitoring and measurement of product

8.4

Analysis of data

Nonconformance and corrective and

4.5.2

8.3

Control of nonconforming product

preventive action

8.5.2

Corrective action

8.5.3

Preventive action

Records

4.5.3

4.2.4

Control of quality records

Environmental management system audit

4.5.4

8.2.2

Internal audit

Management review

4.6

5.6

Management review

5.6.1

General

5.6.2

Review input

5.6.3

Review output

4.2.2

Quality manual






¢Ã ISO 9001 - Annex B


(informative)
Correspondence between ISO 9001:2000 and ISO 9001:1994

Table B.1 Correspondence between ISO 9001:1994 and ISO 9001:2000

ISO 9001:1994

ISO 9001:2000

1 Scope 1

2 Normative reference

2

3 Definitions

3

4 Quality system requirements [title only]

4.1 Management responsibility [title only]

4.1.1 Quality policy

5.1 + 5.3 + 5.4.1

4.1.2 Organization [title only]

4.1.2.1 Responsibility and authority

5.5.1

4.1.2.2 Resources

5.1 + 6.1 + 6.2.1 + 6.3

4.1.2.3 Management representative

5.5.2

4.1.3 Management review

5.6.1 + 5.6.2 + 5.6.3 + 8,5.1

4.2 Quality system [fitle only]

4.2.1 General

4.1 + 4.2.1 + 4.2.2 + 5.1 + 5.4.1

4.2.2 Quality system procedures

4.2.1

4.2.3 Quality planning

5.4.2 + 6.2.1 + 7.1

4.3 Contract review [title only]

4.3.1 General

4.3.2 Review

5.2 + 7.2.1 + 7.2.2 + 7.2.3

4.3.3 Amendment to a contract

7.2.2

4.3.4 Records

7.2.2

4.4 Design control [title only]

4.4.1 General

4.4.2 Design and development planning

7.3.1

4.4.3 Organizational and technical interfaces

7.3.1

4.4.4 Design Input

7.2.1 + 7.3.2

4.4.5 Design output

7.3.3

4.4.6 Design review

7.3.1 + 7.3.4

4.4.7 Design verification

7.3.1 +7.3.5

4.4.8 Design validation

7.3.1 + 7.3.6

4.4.9 Design changes

7.3.7

4.5 Document and data control [title only]

4.5.1 General

4.2.1 + 4.2.3

4.5.2 Document and data approval and issue

4.2.3

4.5.3 Document and data changes

4.2.3

4.6 Purchasing [title only]

4.6.1 General

4.6.2 Evaluation of subcontractors

7.4.1

4.6.3 Purchasing data

7.4.2

4.7 Control of customer-supplied product

7.5.4

4.8 Product identification and traceability

7.5.3

4.9 Process control

6.3 + 6.4 + 7,1 + 7,5,1 + 7,5.2 + 8.2.3

4.10 Inspection and testing [title only]

< style='font-family:"Times New Roman">4.10.1 General

7.1 + 8.1

4.10.2 Receiving inspection and testing

7.4.3 + 8.2.4

4.10.3 In-process inspection and testing

7.4.3 + 7.5.1 + 82.4

4.10.4 Final inspection and testing

7.4.3 + 82.4

4.10.5 Inspection and test records

7.5.3 + 82.4

4.11 Control of inspection, measuring and test equipment [title only]

4.11.1 General

7.6

4.11.2 Control procedure

7.6

4.12 Inspection and test status

7.5.3

4.13 Control of nonconforming product [title only]

4.13.1 General

8.3

4.13.2 Review and dispositioning of nonconforming product

8:3

4.14 Corrective and preventive action [title only]

4.14.1 General

8.5.2+8.5.3

4.14.2 Corrective action

8.4 + 8.5.2

4.14.3 Preventive action

8.4 + 8.5.3

4.15 Handling, storage, packaging, preservation & delivery [title only]

4.15.1 General

4.15.2 Handling

7.5.5

4.15.3 Storage

7.5.5

4.15.4 Packaging

7.5.5

4.15.5 Preservation

7.5.5

4.15.6 Delivery

7.5.1 + 7.5.5

4.16 Control of quality records

42.4

4.17 Internal quality audits

8.2.2 + 8.2.3

4.18 Training

6.2.1 + 6.2.2

4.19 Servicing

7.1 +7.5.1

4.20 Statistical techniques [tMle only]

I

4.20.1 Identification of need

+ 82.3 + 8.2.4 + 8.4

4.20.2 Procedures

- - ~8.1

4.6.4 Verification of purchased product

7.4.3

1 Scope

1

1.1 General

1.2 Application

2 Normative reference

2

3 Terms and definitions

3

4 Quality management system [title only]

4.1 General requirements

4.2.1

4.2 Documentation requirements [title only]

4.2.1 General

4.2.1 +4.5.1

4.2.2 Quality manual

4.2.1

4.2.3 Control of documents

4.5.1 + 4.5.2 +4.5.3

4.2.4 Control of quality records

4.16

5 Management responsibility [title only]

5.1 Management commitment

4.1 + 4.1.2.2 + 4.2.1

5.2 Customer focus

4.3.2

5.3 Quality policy

4.1.1

5.4 Planning [title only]

5.4.1 Quality objectives

4.1.1 + 4.2.1

5.4.2 Quality management system planning

4.2.3

5.5 Responsibility, authority and communication [title only]

5.5.1 Responsibility and authority

4.1.2.1

5.5.2 Management representative

4.1.2.3

5.5.3 Internal communication

5.6 Management review [title only]

4.1.3

5.6.1 General

4.1.3

5.6.2 Review input

4.1.3

5.6.3 Review output

4.1.3

6 Resource management [title only]

6.1 Provision of resources

4.1.2.2

6.2 Human resources [title only]

6.2.1 General

4.1.2.2+4.2.3+4.18

6.2.2 Competence, awareness and training

4.18

6.3 Infrastructure

4.1.2.2 + 4.9

6.4 Work environment

4.9

7 Product realization [title only]

7.1 Planning of product realization

4.2.3 + 4.9 + 4.10.1

7.2 Customer-related processes [title only]

7.2.1 Determination of requirements related to the product

4.3.2 +4.4.4

7.2.2 Review of requirements related to the product

4.3.2 + 4.3.3 + 4.3.4

7.2.3 Customer communication

4.3.2

7.3 Design and development [title only]

7.3.1 Design and development planning

4.4.2 + 4.4.3 + 4.4.6 + 4.4.7 + 4.4.8

7.3.2 Design and development inputs

4.4.4

7.3.3 Design and development outputs

4.4.5

7.3.4 Design and development review

4.4.6

7.3.5 Design and development verification

4.4.7

7.3.6 Design and development validation

4.4.8

7.3.7 Control of design and development changes

4.4.9

7.4 Purchasing [title only]

7.4.1 Purchasing process

4.6.2

7.4.2 Purchasing information

4.6.3

7.4.3 Verification of purchased product

4.6.4 + 4.10.2 + 4.10.3 + 4.10.4

7.5 Production and service provision [title only]

7.5.1 Control of production and service provision

4.9 + 4.10.3 + 4.15.6 + 4,19

7.5.2 Validation of processes for production and service provision

4.9

7.5.3 Identification and traceability

4.8 + 4.10.5 + 4.12

7.5.4 Customer property

4.7

7.5.5 Preservation of product

4.152 + 4.15.3 + 4.15.4 +.4.15.5 + 4,15.6

7.6 Control of monitoring and measuring devices

4.11.1 +4.11.2

8 Measurement, analysis and improvement [title only]

8.1 General

4.10+4.17+4.20.1

8.2 Monitoring and measurement [title only]

8.2.1 Customer safisfaction

8.2.2 Internal audit

4.17

8.2.3 Monitoring and measurement of processes

4.9 +4.17 +4.20.1

8.2.4 Monitoring and measurement of product

4.10.2 + 4.10.3 + 4.10.4 + 4.10.5 + 4.20.1

8.3 Control of nonconforming product

4.13.1 +4.13.2

8.4 Analysis of data

4.14.2+4.14.3+4.20

8.5 Improvement [title only]

8.5.1 Continual improvement

4.1.3

18.5.2 Corrective action

4.14.1 + 4.14.2

8.5.3 Preventive action

4.14.1 +4.14.3




Bibliography

[1] IS09000??:1997, Quality management and quality assurance standards??Part 3: Guidelines for the application of ISO 9001:1994 to the development supply, installation and maintenance of computer software.
[2]
ISO 9004: -- 1),Qualitymanagementsystems?멒uidelines for performance improvements.
[3]
ISO 10005:1995, Quality management?? Guidelines for quality plans.
[4]
ISO 10006:1997, Qualitymanagement?멒uidelines to quality in project management
[5]
ISO 10007:1995, Quality management?멒uidelines for configuration management.
[6]
ISO 10011??:1990, Guidelines for auditing quality systems?멠art 1: Auditing 2).
[7]
ISO 10011??:1991, Guidelines for
auditing quality systems?멠art 2: Qualification criteria for quality systems auditors2).
[8] IS010011??:1991, Guidelines for auditing quafrtysystems?멠art3:Managementofauditprogrammes
2).
[9]
ISO 10012??:1992, Quality assurance requirements for measuring equipment??Part 1: Metrological
confirmation system for measuring equipment3).
[10]
ISO10012??:1997, Quality assurance for measuring equipment??Part2: Guidelines for control of measurement processes3).
[11]
ISO 10013:1995, Guidelines for developing quality
manuals.
[12]
ISO/TR 10014:1998, Guidelines formanaging the economics of quality.
[13]
ISO 10015, Quality management ??Guidelines for training.
[14]
ISO/TR 10017:1999, Guidance on statistical techniques for ISO 9001:1994.
[15] ISO 14001:1996, Environmental management systems?멣pecification with guidance for use.
[16] ISO/TC 176/SC 2/N 376, Quality management principles and guidelines on their application4).
[17] Reference websites: http://www.iso.ch

1) To be published
2) To be revised as ISO 19011, Guidelines for auditing management systems.
3) To be revised as ISO 10012, Quality
assurance requirements for measuring equipment


ÀÌÀü ISO 9001 : 2000
´ÙÀ½ ISO 9004 : 2000